[1]
Korponai, J. and Bányai, Ágota 2016. SENSIBILITY ANALYSIS OF THE PLANNED AVAILABILITY PERIOD AND OF THE IMPACT OF THE COST FACTORS ON TOTAL COSTS. Advanced Logistic Systems - Theory and Practice. 10, 1 (Sep. 2016), 13–28.