Project Oriented Management (POM) and Logistical Challenges in Maintenance and Network Development Systems
DOI:
https://doi.org/10.32971/als.2023.025Keywords:
Project Oriented Management (POM), Procurement and Logistics Centre (PLC), perfomance assistance, subcontractors, project manager, supplier, Service Provider CompanyAbstract
Maintenance, Refurbishment and Network Upgrading Systems occupy a prominent place among service systems, especially due to their dispersed location and large territorial extent. For the efficient opertaion of these systems, it is essential to apply Project Oriented Management (POM), which aims at optimizing logistic processes and meeting project specific requirements.
Downloads
Published
2023-12-19
How to Cite
Latorcai, Z. L., Illés, B., & Tamás, P. (2023). Project Oriented Management (POM) and Logistical Challenges in Maintenance and Network Development Systems. Advanced Logistic Systems - Theory and Practice, 17(4), 5–13. https://doi.org/10.32971/als.2023.025
Issue
Section
Articles